Landquart, expansion of the workshop for thermal vehicles and interior switchgear - BKP 213 assembly construction in steel
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
In the workshop for thermal vehicles, four tracks with pits are being expanded to a usable length of 20 m by means of a hall addition and expansion. Furthermore, replacement areas will be created for material storage and office space. In the track field in front of the workshop halls, the D group tracks will be renewed and their position will be adapted to the geometries of the new hall entrances.
The interior switchgear for the overhead line will be housed in the newly constructed basement. The basement is constructed using solid construction and measures approximately 27.2 by 24.8 meters. In the extension to the existing hall, a new hall (West Hall) measuring around 28.4 by 14.4 meters will be built using steel construction (two-jointed frame construction with a 6 m column grid).
The hall has a mezzanine floor under terrain in solid construction. The workshop extension, Hall East (17.7 by 13.4 meters) has a partial basement. It will be built as a single-story steel structure.
Furthermore, a two-story intermediate building (15.7 by 8.2 meters) is being built in solid construction, which also has a partial basement. The addition and expansion takes place parallel to workshop operations and the usability of two tracks in the workshop must be guaranteed throughout the entire construction period.