Poland – Generator units – Delivery, installation and commissioning of 2 generators with a minimum power of 400 to 450 kW each, with a total minimum power of 800 to 900 kW, along with design documentation.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the order is the delivery, assembly and commissioning of two power generators, with a minimum power of 400 to 450 kW each, operating in synchronization, constituting a generating set, with a total minimum power of 800 to 900 kW, along with the preparation of the place for their installation, construction of a cable route between the generators and the SZR of Miejskie Przedsiębiorstwo Czyszczania Sp. z o. o. in Toruń and design documentation (obtaining a building permit) and connections.