Renovation of town hall, sanitary, heating and ventilation installations The complete re-construction of the entire drinking water network within the building will be carried out in the course of the comprehensive renovation of St. Georges Town...
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Renovation of town hall, sanitary, heating and ventilation installations The complete re-construction of the entire drinking water network within the building will be carried out in the course of the comprehensive renovation of St. Georges Town Hall. The entire drinking-water system will be completely refurbished and adapted to the current technical and hygienic requirements. The existing domestic water supply system will have to be rebuilt and re-introduced into the building by the responsible water supplier Aquavilla. Following the first major refurbanization, the entire new drinking- water network will be fully re-established within the buildings. The new drinking water system will also be fully developed and mostly implemented in a high-quality, high-level water supply pipeline. The system will ensure a high level of drinking water supply and a minimum of wastewater disinfection, and the system will continue to be integrated into the system through the continuous use of waste water as a means of maintaining the system, including the maintenance of the system and the maintenance and maintenance of its energy, in particular through the use of modern water supply systems, which will be integrates the system with the use and maintenance, in addition to the maintenance, of the maintenance.
During the firefighting phase of the building, a dry fire suppression system (dry fire suppressor system) shall be installed within the building and placed in appropriate installation units or fire suppressive areas in accordance with applicable regulations and accepted technical rules. The system shall be used to support firefighters in the event of a fire and shall provide a rapid and secure supply of fire water to each floor of the structure. The dry fire pump shall be operated as a fixed pipe within the structure and placed on suitable installation units and/or fire sup suppressors in areas that are closed to fire. The operation shall be carried out in a fire supply system equipped with corrosion-resistant equipment, which is operated for the use of the installation units in the operation point of the operation, and shall be maintained in the installation area. The pressure suppression of the dry fire is also ensured in the building area by a system of controlled water supply and is carried out to a safe and safe environment in accordance to the requirements of the fire and fire safety regulations, and the fire supmission of the equipment is ensured by the use and the use is made of a suitable means of reducing the risk of fire and the flow of water in the fire, and is provided by the fire-resistance and the desulfight system is provided in accordance the minimum necessary conditions.
Related Procurement Opportunities
Similar tenders in Water and Sanitation, Construction materials, Infrastructure and construction