AUTUN PANOPTIC – RENOVATION AND EXTENSION OF THE ROLIN MUSEUM OPERATIONAL SECTION 1 (TO1) - (relaunch of lots 2, 6, 7, 8, 14, 16, 17).
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
AUTUN PANOPTIC – RENOVATION AND EXTENSION OF THE ROLIN MUSEUM OPERATIONAL SECTION 1 (TO1) - (relaunch of lots 2, 6, 7, 8, 14, 16, 17). This consultation relates to the relaunch of lots 2 (broken down into 3 separate lots: 0201, 0202 and 0203), 6, 7, 8 (broken down into 2 separate lots: 0801 and 0802), 16, 17 (lots declared without further action for unacceptable offers) and 14 (declared unsuccessful for lack of offers), as part of the work of renovation and extension of the Rolin Museum - Operational phase 1 (TO1) - Panopticon of Autun. The purpose of this lot is exterior carpentry work (existing heritage) on the former prison/Hotel Lacomme/Hotel Rolin/Tribunal and interior carpentry work (existing heritage) on the former prison/Hotel Lacomme/Hotel Rolin. The purpose of this lot is plumbing, heating, ventilation, air conditioning and smoke extraction work. The purpose of this lot is graphics and signage work. The purpose of this lot is to carry out various road and network works. The purpose of this lot is to carry out green space works. The purpose of this lot is metal framework and roofing work. The purpose of this lot is exterior carpentry and facade treatment work. The purpose of this lot is metalwork, locksmithing, furniture and metalwork, locksmithing work (existing heritage) on the former prison/Hôtel Lacomme/Hôtel Rolin. This batch is broken down into a firm tranche and an optional tranche. This lot includes a PSE (Possible Additional Benefit) with a mandatory response. The purpose of this lot is electrical work. The purpose of this lot is lighting work.