Copy of Study Assignment Traffic Circulation and Parking Overpelt - center OVHO26033 - 2 - 1
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Copy of Study Assignment Traffic Circulation and Parking Overpelt - center OVHO26033 - 2 - 1
The municipality of Pelt wishes to conduct an integrated study into traffic circulation and parking policy in Overpelt Center. This study is necessary in light of a number of important spatial and infrastructural developments that will have a significant impact on accessibility, quality of life and traffic flows within the study area. In addition, the municipality wishes to investigate the route of the bicycle highway F71 on the Ringlaan (north side between Houtmolenstraat and Bemvaartstraat) and have a design drawn up. The study aims to: • develop a future-oriented circulation plan; • optimizing the parking policy; • increasing the quality of life and road safety; • reducing through and cut-through traffic; • guaranteeing good accessibility for residents, traders and visitors. • Designing the F71 bicycle highway on the Ringlaan
Related Procurement Opportunities
Similar tenders in Transportation, Roads and Highways, Infrastructure and construction