Adaptation C900, conversion Friesenberg
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The existing Friesenberg stop is located within the entry signals of the Borrweg intersection. As part of the project, the crossing point will be extended and expanded to the Friesenberg stop with two outside platforms. As a result of these measures, the safety system and the control technology must be gradually adapted to the new infrastructure and track topology. The existing Command 900 control technology will generally continue to be used. However, due to the infrastructural changes, adjustments are required in the areas of display, operation, train number reporting and train routing. This concerns new, modified and provisional system elements as well as the replacement of the existing track vacancy notification with axle counting sections.