ARA Thurau, trough loading station including troughs and guide rails
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The wastewater treatment plants (WWTP) in Wil, Jonschwil, Zuzwil and Uzwil will be closed and the new ARA Thurau will be built on the site of the ARA Uzwil in Niederuzwil. The new facility will be designed for 130,000 residents. The subject of the present submission is the sludge-contacting conveyor technology and the mechanical equipment of the dumpster loading station for the west stage of the new Thurau ARA.
This includes the main screw conveyor from the decanter, the distribution screw conveyors for the trough loading, the pneumatic shut-off devices, the covers with integrated draft ventilation as well as the pneumatically operated tilting devices for the troughs and the guide rails on the floor. What is required is the complete process engineering design, factory fabrication, delivery free to the construction site, ready-to-use assembly, corrosion protection and the successful commissioning (dry and wet acceptance) of all components in accordance with the present submission documents.