D3 0312/I Chapel station - Nažidla D3 0312/I Chapel station - Nažidla
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
D3 0312/I Chapel station - Nažidla D3 0312/I Chapel station - Nažidla
The subject of the contract is the construction of the highway D3 0312/I Kaplice nádraží – Nažidla. Section D3 0312/I, which is part of the newly built D3 highway Prague – Tábor – České Budějovice – state border of the Czech Republic/Austria and will enable the transfer of traffic from the existing road I/3 between Kaplicá nádraží and Suchdol. It is a newly constructed four-lane highway category D 25.5/130 with a length of 11,990 km in km 159,550 to 171,550, with an asphalt cover, equipped with the SOS system and the necessary drainage. The terrain through which the route runs is mostly free, undeveloped, and the entire route runs through agricultural land and forest stands. The beginning of construction 0312/I follows on from the previous construction 0311 Třebonín – Kaplice nádraží. The route of the D3 highway in section 0312/I runs west of the existing road I/3, at a distance of approx. 100 - 1000 m. Several bridge structures are proposed on the construction site, including two bridge overpasses Zdíky and Suchdol. On the section D3 0312/I Kaplice nádraží – Nažidla, a two-sided rest stop Suchdol and the construction of an anti-noise wall, Osovský dvůr in the cadastral area of Střítež u Kaplice, which is proposed on the D3 highway on the section 0311 Třebonín - Kaplice nádraží and on the section 0312/I Kaplice nádraží - Nažidla, are proposed in the KÚ.
Related Procurement Opportunities
Similar tenders in Railways, Transportation, Infrastructure and construction