[Award] 7th Avenue at Cedar River Water Main Improvements
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Contract Award Notice: 7th Avenue at Cedar River Water Main Improvements Awarded Vendor: Langman Construction The Work generally consists of the installation of a 16-inch ductile iron water main across the Cedar River by open cut installation at 7th Avenue to replace the existing 16-inch ductile iron water main at the 8th Avenue Bridge Cedar River Crossing. located at 7th Avenue From Valor Way SW, across Cedar River, to 1st St SE. The Engineer’s opinion of probable cost is $2,610,000 Early Start Date: Upon Receipt of Notice to Proceed Late Start Date: N/A Milestones: Milestone 1 (02/26/2027) - Complete Construction, Disinfection, Hydrostatic Testing, And Connection Of Water Main From Sta 100+00 To Sta. 110+10.62. Restoration Of River Bed To Pre-Construction Elevations And Removal And Disposal Of Causeway Fill And Excess Native Material From The Project Site, In Advance Of The Eighth Avenue Bridge Project. Final Completion: Completion Date - 04/30/2027
Related Procurement Opportunities
Similar tenders in Bridges and Tunnels, Infrastructure and construction, Metals and Non-Metals