Get Free Access
TZ Ref No.: TZ-1156474
Tender Notice Live Notice National (NCB) United States Construction materials Infrastructure and construction Engineering

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Doc ref no. RFP-376508-CD
Sector Construction materials, Infrastructure and construction, Engineering
Publish Date 08 Oct 2026
Estimated Value Undisclosed
Tender Intelligence
Qualification analysis + key highlights for this procurement

TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Description & Project Overview

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
On october 7, 2026, amendment no. 2 was issued to correct badge access link provided in amendment no. 1.
on october 6, 2026, amendment no. 1 was issued to provide dates for site visits.
this scope of work is to build an addition and renovate the central utility building (cub). the cub supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. these systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. it is vital to fermilab’s mission that cub be revitalized and expanded, ensuring the ability to serve existing and future loads.
the general contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. all work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
the critical schedule constraint for construction of this project is fermilab’s accelerator shutdown, with an anticipated scheduled start on january 1, 2028, and anticipated end date of january 1, 2030- these dates may change depending on the needs of the lab. the general contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
this project includes the following milestones:
milestone 1 – issuance of notice to proceed (ntp) to 30th december 2027. this milestone is intended for completion of necessary submittals and rfis, approval of shop drawings for fabrication and procurement.
milestone 2 – 3rd january 2028; this milestone marks the point where construction work may begin.
milestone 3 – 31st january 2029; aup 1 cub extension complete.
milestone 4 – 29th june 2029; aup 2 existing cub upgrade complete.
milestone 5 – 28th september 2029; completion of cub- including all remedial work following removal of site trailers.

Days to Deadline
30 days
Closing: 17 Nov 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Procurement Details

Doc ref no. RFP-376508-CD
Notice Type Tender Notice
Bidding Type NCB
Publish Date 08 Oct 2026
Sector Construction materials, Infrastructure and construction, Engineering
Document Fee Available in full notice
Bid Security Refer to documents
Funding Government Budget
Bid Opening Locked

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →