Germany – Demolition work – Dismantling of the old smoldering bath
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Dismantling of the old smoldering bath As part of the construction of the new indoor swimming pool at the site of the former Schwelmebad in Schwelm, the outdoor swimming pool must be completely dismantled. The measure includes the demolition of the existing building and the outdoor pools. I. Eligibility criteria) 1. Economic and financial suitability a) Professional liability insurance Business liability insurance, coverage of at least 5 million euros. 2. professional suitability and performance Two references from the last three years (at least partially basement buildings with enclosed space