Requalification of the PAE des Plénesses - Repair work on rue Bois-la-Dame
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The purpose of the company governed by these special specifications is: THE REHABILITATION of RUE BOIS-LA-DAME with CREATION OF A TEMPORARY ROAD at the DES PLENESSES ECONOMIC ACTIVITY PARK. The scope of the work is shown in the 1/25,000 site plan making up the file: – for rue Bois-la-Dame in blue line with a length of 512 meters; – for the provisional red line road with a length of 300 meters. This section is located at the entrance to the PAE up to the roundabout of Grondal, Trois Entités and Léon Crosset streets with a length of 512 meters as well as the construction and subsequent dismantling of a temporary diversion road intended to maintain traffic conditions for the duration of the project. Rue Bois-la-Dame constitutes a municipal road providing service to businesses located in the area and supporting significant daily traffic including a significant proportion of heavy goods vehicles. The existing road currently has a width of 6 meters of hydrocarbon coating between linear elements. The project provides for its widening to 7 meters in order to harmonize the gauge of the roadway with that of other roads in the zoning such as rue Grondal, du Tiège, du Bosquet and to improve traffic and crossing conditions for heavy vehicles. The work is being carried out in 3 Phases on the road section of the IIb network where heavy traffic is between 250 and 1000 vehicles per day and per direction of traffic. The 1st Phase corresponds to the creation of the temporary road to open to diversion traffic during the work of the 2nd Phase. The 2nd Phase corresponds to the renovation of rue Bois-la-Dame; The 3rd Phase corresponds to the dismantling of the temporary road and the restoration of the plots to their original state. Each phase begins after complete finalization of the previous phase.