BCD new building, extended shell construction work (V0570/2026)
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Internal identifier: V0570/2026 Title: BCD new building, extended shell work Description: Extended shell work Type of contract: Construction work Description: - 259 m construction fence, height 2 m, with construction fence feet made of concrete and construction fence connectors - 646 m2 of construction site reinforcement made of mineral mixture with later dismantling - 1 construction crane, hook height approx. 25 m, boom approx. 55 m, including foundation - 230 m2 of clearing the site with existing paving and slab coverings - 150 m demolition of existing fence systems made of steel mesh mats, H 1200 mm and 1500 mm - 1 piece sanitary container 20" for H - 1 piece sanitary container 10" with showers for H - 1 piece sanitary container 10" for D - 1 piece double office container 20" - 1 piece rubble container 5 m3 for pure rubble (recyclable) - 1 piece rubble container 5 m3 for construction waste (mixed) - 3,350 m2 facade scaffolding, longitudinally oriented, GK 4, W 09, H 1 - 3 pieces of external staircases, single-flight - 3 pieces of material lifts on the facade scaffolding - 6 pieces of rolling scaffolding for interior work - 2,950 m3 of soil excavation and removal of soil material BM-0 to BM-F2 - 290 tons of disposal Soil excavation of the BM-0 - 2,555 tons Disposal Soil excavation of the BM-F1 - 970 tons Disposal Soil excavation of the BM-F2 - 5,810 m Soil improvement made of unreinforced VVB piles, diameter approx. 38 cm - 1,350 m2 Load distribution layer made of cement-solidified gravel, 2-layer, D 60 cm - 300 m2 wooden plank shoring (Berlin shoring) in several areas - 1,386 m2 of perimeter insulation of the base plate and strip and individual foundations made of 190 m3 of in-situ concrete for the strip and individual foundations made of reinforced concrete C30/37 - 400 m3 of in-situ concrete of the outer walls and columns made of reinforced concrete C30/37, D 15 - 30 cm - 195 m3 of in-situ concrete of the inner walls and columns made of reinforced concrete C30/37, D 20 - 30 cm - 372 m2 of formwork for the wall openings in External and internal walls - 1,190 m2 of in-situ concrete for the roof ceiling