Luxembourg – Road bridge construction work – Hosingen bypass – Lot C3.1 – OA881, future CR342 and PC07
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Lot C3.1 includes the construction of the OA881 engineering structure, the BF3 retention basin, as well as the associated road improvements, including the PC7 cycle path. This submission begins at PK 0+000 of the future CR342 and ends at PK 1+850, upstream of the future Leemkaul/Dorscheid interchange as part of the Hosingen Bypass. Excavated: 51,500 m3 Embankments: 123,000 m3 Lime supply: 1,600 to Coated: 8,800 to Reinforcements: 574,000 kg Formwork: 5,500 m2 Concrete: 4,000 m3