K 40 Willisau, level crossing – Bruggmatt roundabout
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The K 40 Ettiswilerstrasse in Willisau is being renovated at around 360 meters between the Bruggmatt roundabout and the level crossing. The road surfaces and the water pipe will be replaced, a separation system for rainwater and wastewater will be created and the drainage system will be adjusted. The Chrüzhof bus stops will be expanded to be barrier-free and crossing points, traffic islands and affected walking areas and access routes will be adapted.
The work will be carried out in stages, generally with one-way traffic. Access to adjacent properties remains guaranteed as far as possible. A total nighttime closure is planned for work in the Bruggmatt roundabout.