Germany – Network infrastructure – Renewal of network infrastructure
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The Max Planck Institute for the Physics of Light (MPL) is replacing the network components of its data center (Juniper QFX5100 and EX4300) as well as the core switches, whose manufacturer support ends in 2027 and 2029, respectively. The data center will be built as a spine leaf fabric with EVPN/VXLAN; the new leaves are connected to the existing spines (Juniper QFX5120‑32C). The network is operated as a network together with the Max Planck Center for Physics and Medicine (MPZPM) (shared fabric, automation with Ansible).