Large Hangar Renovation (GH) - General Planner
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Genève Aéroport (“GA”) wishes to carry out a major renovation of the Grand Hangar (GH) and optimize its operation. The main objective of the GH renovation project is to renovate the building envelope in order to drastically reduce “the heat consumption of the structure”. The secondary objectives are listed in order of priority below:
- Upgrade all equipment that requires it in order to obtain a level of safety in accordance with the standards and laws in force.
- Maximize photovoltaic solar production to achieve the GA objective.
- Renovate all interior surfaces and clean them of pollutants and obsolete equipment.
- Label the DGNB building - “Silver” level renovation.
- If necessary, reprogram the building to optimize the activities located there and the associated rental income.
The successful bidder for this contract will be a General Planner (PG) to whom GA will entrust phases SIA 31 to 53 in accordance with regulations SIA 112 and SIA 102 (art 3.4.1 for services). The PG must include in his offer all the services of specialists that he considers necessary for the success of his mission and the completion of the project in accordance with the rules of the art. The specialists' services can be subcontracted, it being specified that the identity of the subcontractors must not be communicated at the time of the call for tenders, except for the specialist in extinguishing systems for aircraft hangars (according to standard NFPA409 or FM DS7.93) which must be determined at the time of submission of the offer.
Any communication and/or document concerning other possible subcontractors will be considered by GA as purely indicative and not binding. GA chose an ET for execution. The PG's services for the implementation phases (SIA 51 to 53) will be those of support as quality AMO.