Germany – Construction work for swimming pool – Zeller Land Adventure Pool - Lot 25.2 - Curtain facade
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The Zeller Land adventure pool was built around 45 years ago as a pure sports pool adjacent to the existing outdoor pool. In 1993 the indoor pool was expanded and the outdoor pool area was closed except for the children's paddling pool. Some areas of the bathroom are still original from 1974 and are therefore in appropriate condition. Even the newer components from the 1990s already show significant defects and signs of wear on the construction and technical systems. This was done by the Verbandsgemeinde of Zell an der Mosel as the operator of the pool in 2019
Related Procurement Opportunities
Similar tenders in Infrastructure and construction