Poland – Construction work – Design, construction and reconstruction of national road No. 60 on the Gostynin-Płock section, divided into two sections: Section 1. Design, construction and reconstruction of national road No. 60 on the Gostynin-Płock section from km approx. 52+357 to km approx. 55+737 and from km approx. 59+011 to km approx. 61+900; Episode 2. Design and construction of the Łącko bypass.
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The order includes in particular: 1. designing, based on the requirements contained in the SWZ, a single-carriageway class G road on the section from Gostynin to Płock along national road No. 60 from km approx. 52+357 to km approx. 55+737 and from km approx. 59+011 to km approx. 61+900 and construction of the Łącko bypass, divided into 2 sections, 2. Preparation of technical documentation enabling the implementation of works on the indicated road sections as above, 3. Obtaining on behalf of and for the benefit of the Ordering Party all legally required opinions, arrangements, permits, permits and decisions necessary to design and implement
Related Procurement Opportunities
Similar tenders in Roads and Highways, Infrastructure and construction