Lot 06 Shell construction, earthworks, wooden trusses, scaffolding; New sports hall Artur-Becker-Oberschule Lot 06 Shell construction - earthworks - wooden trusses - scaffolding
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Lot 06 Shell construction, earthworks, wooden trusses, scaffolding; New sports hall Artur-Becker-Oberschule Lot 06 Shell construction - earthworks - wooden trusses - scaffolding
Earthworks approx. 4,136 m3 excavated excavation excavation pit, foundations, line trenches, approx. 2,357 m2 create planum, foundation base, approx. 525 m3 backfilling work rooms etc. Concrete work - in-situ concrete approx. 146 m3 in-situ concrete strip foundations C30/37, approx. 2,250 m2 floor slabs C30/37, approx. 648 m2 external walls C30/37, approx. 846 m2 interior walls C30/37, approx. 162 t of reinforcing steel in various designs. Concrete work - prefabricated and semi-finished parts, approx. 758 m2 of double panel walls inside and outside, C30/37, approx. 1,311 m2 of filigree ceilings, C30/37, approx. 22 pieces of prefabricated columns in various dimensions, C30/37, approx. 65.3 t of reinforcement. Concrete work - prefabricated stairs 10 pieces of prefabricated stairs in various designs, 16 pieces of prefabricated supports, 28 pieces of prefabricated grandstand parts in various designs, approx. 10 t of reinforcement. Carpentry and timber construction work, approx. 297 m3 of glulam in various designs and cross-sections, approx. 1279 m of joinery/laying of the various glulam timbers for roof associations, various built-in steel parts, metal construction work approx. 1520 m2 of roof support shell made of trapezoidal steel sheet. Sealing work approx. 2,350 m2 2-layer bituminous waterproofing, horizontal or inclined, approx. 307 m2 2-layer bituminous waterproofing, vertical, approx. 430 m2 perimeter insulation. TGA approx. 110 m of underground pipes in various diameters, approx. 90 pcs of bends, branches, reducers, drains etc., approx. 45 m of rainwater pipes, approx. 27 pcs of bends, branches, reducers, drains etc. Earthing system approx. 1,080 m of ring earth electrodes, connecting lines and foundation earth electrodes in various designs
Related Procurement Opportunities
Similar tenders in Construction materials, Industry, Sports and leisure