Switzerland – Architectural, construction, engineering and inspection services – SIA phase 31 in parts & SIA phases 32-53 Civil engineer as overall manager of renovation of fish passage main power plant and doping power plant WKW Aarberg
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
BKW Energie AG is the owner, concessionaire and operator of the Aarberg an der Aare hydroelectric power plant (WKW). The Aarberg WPP uses the water of the Aare to generate electricity in accordance with the applicable water use concession. The Aarberg weir and the main and power plant are located in the municipality of Aarberg. Most of the water is turbined into the Aare-Hagneck Canal by the main power plant. The doping power plant turbines between 3.5 and 5.5 m3/s into the Alte Aare. The main Aarberg power plant is a block power plant with two vertical tube turbines. With a maximum usable fall height