GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
On october 09, 2026, amendment 0004 to solicitation 1240lt26q0106 - gaoa kents lk. cg reconstruction, fishlake national forest has been posted to sam.gov and accomplished the following:
1. replace davis bacon wages labeled c04e attachment 5 general decision ut20260102 05182026 with davis bacon wages labeled c05a general decision ut20260102 05182026.
2. change submission due date from 10/15/2026 to 10/28/2026.
*****************************************************************************************************************************************************
on september 24, 2026, amendment 0003 to solicitation 1240lt26q0106 - gaoa kents lk. cg reconstruction, fishlake national forest has been posted to sam.gov and accomplished the following:
1. post rfi questions and answers labeled c05a final rfi qa 1240lt26q0106.
2. post site visit sign in sheet labeled c05b site visit sign in 1240lt26q0106.
3. utility tables shall be government furnsihed under line 6 of the notes on page d12 of the drawings is removed in its entirety.
4. part 2 - products from specifications section 323125 - composite wood fence is removed in its entirety. see file labeled c05c attachment 2 spec 1240lt26q0106 092426.
5. extends the due date for quotes from 09/23/2026 to 10/15/2026.
this amendment must be acknowledged and submitted with your proposal.
**********************************************************************************************************************************************
on september 22, 2026 the due date for quotes was extended to october 8, 2026. an amendment will follow that will post the questions and answers thta were received.
***********************************************************************************************************************
on september 3, 2026, amendment 0002 to solicitation 1240lt26q0106 - gaoa kents lk. cg
reconstruction at fishlake national forest has been posted to sam.gov and accomplished the following:
1. post the rfi q&a labeled c05a rfi q&a 1240lt26q0106.
2. post the update specifications labeled c05b specs kentslakecg_final_5.2.2026
3. post the updated soi labeled c05c soi kents lake 05.18.2026
this amendment must be acknowledged and submitted with your proposal.
***********************************************************************************************************************************************
on august 19, 2026, amendment 0001 to solicitation 1240lt26q0106 - gaoa kents lk. cg reconstruction, fishlake national forest has been posted to sam.gov and accomplished the following:
post updated soi labeled c04a attachment 1 soi 1240lt26q0106.
this sf30 must be acknowledged and submitted with your proposal.
*************************************************************************************************************************************************
the kent’s lake campground reconstruction project, part of the great american outdoors act (gaoa) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. the work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. the project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.