Poland – Engineering design services for the construction of civil engineering works – Preparation of complete design documentation along with obtaining legally required administrative decisions necessary to carry out construction works (MRN3) - wetlands in the Świerklaniec Forest District
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the order is the preparation of complete documentation (hereinafter referred to as documentation) along with obtaining opinions, arrangements and decisions required by construction law administrative and authorial supervision for the following tasks: Part 1: Task No. 02-31-1.2-07 - restoring the functions of wetlands (over an area of 10.68 ha) by building gates on the drainage ditch and building a water intake point with an area of approx. 0.01 ha, a depth of 1.5 m, along with a maneuvering area and access. The water intake point is to be made in the form of a natural well dug in the ground