Germany – General construction work for pipelines – Stadtwerke Barsinghausen: New construction of the Eckerde waterworks - VE 2 Civil and pipeline construction (LV05)
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Stadtwerke Barsinghausen GmbH has decided to build a new “Eckerde waterworks”. The construction site and the foundation are located exactly opposite the existing Eckerde drinking water treatment plant. The new waterworks is planned and equipped with state-of-the-art technology. The scope of this tender relates to civil engineering and pipeline construction work (VE2). The installation is carried out in accordance with DIN EN 805. Width, evenness and slope must be checked. When laying sewer pipes, the gradient specified in the implementation plans is precise