"Repair of road surface III/2087 Rybničná"
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the performance of the public contract is the execution and procurement of all works and construction of works necessary for the implementation of the construction event. This is the repair of road III/2087 station 0.000 - 1.050 m. Milling will be carried out in an average thickness of 50 mm with leveling of the profile and with a smooth connection to the existing condition in a total area of approx. 5700 m2. The milled material will be contractually purchased at a predetermined price by the contractor. Furthermore, leveling from ACL 16+ in the amount of approx. 30 t. After the joint spraying, an abrasive layer of ACO 11+ with a thickness of 50 mm without a central joint will be laid. The shoulders will be supplemented with compaction, including VDZ design with a guide line width - 12.5 cm. Working joints will be cut and filled with modified grout, and at the point of descents, a seamless connection to the existing condition will be made. The minimum required warranty period is 36 months for the surface and 24 months for the VDZ. Place of performance: Sokolov Contract type: Stavební práce Procedure regime: VZ malého rozsahu Awarded to: Silnice Topolany a.s. Awarded contract value: 2,713,940.00 CZK