Prace na podstawowych ciągach pasażerskich (E 30 i E 65) na obszarze Śląska, Stage I: line E 65 na odcinku Będzin - Katowice Szopienice Płd. Prace na podstawowych ciągach pasażerskich (E 30 i E 65) na obszarze Śląska, Stage I: line E 65 na...
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Prace na podstawowych ciągach pasażerskich (E 30 i E 65) na obszarze Śląska, Stage I: line E 65 na odcinku Będzin - Katowice Szopienice Płd. Prace na podstawowych ciągach pasażerskich (E 30 i E 65) na obszarze Śląska, Stage I: line E 65 na odcinku Będzin - Katowice Szopienice Płd.
1. Basic scope: Part. A: 1.1) Implementation of construction works. in the scope of: a. track system with drainage; b. engineering facilities; c. buildings, small architecture and platforms; d. noise barriers; e. road system with accompanying infrastructure; f. overhead contact line; g. power networks; h. SDIP, SMW; i. collisions and electricity, water, sewage and gas connections; j. revival sections of tram lines in the immediate vicinity of railway viaducts; k. modernization of the facilities of the Special Emergency Train in St. Sosnowiec Gł. l. Building facilities for environmental protection. 1. 2) Doc. as-built, including: a. development of technical regulations, in cooperation with the Ordering Party, b. development of as-built geodetic documentation, c. development of documentation for the establishment and measurement of the Railway basic geodetic network and the Railway special network, d. development of new traffic control control schemes and point expeditionary. 1.3) Conducting the conformity assessment process of structural subsystems within the scope of the order at each stage and submitting the appropriate EC verification declarations and EC verification certificates for the subsystems. 1.4) Conducting the process and obtaining, on behalf of the Ordering Party, permission to operate the structural subsystems Infrastructure, Energy and Control - trackside devices 1. Basic scope: Part. B: 1.5) Preparation of the detailed design and implementation of construction works for the SRK industry, including CSDIP and SMW; 1.5.1) Design documentation, including: a. development of an executive design, b. development of as-built documentation, 1.5.2) works in the scope of: a. railway traffic control devices (internal and external), b. reconstruction of railway telecommunications network devices (fiber optic and copper cable networks), c. power engineering devices and systems up to 1 kV, d. equipping stops and stations with the Central System Dynamic Traveler Information and Visual Monitoring System. 1.5.3) As-built documentation, including: a. development of technical regulations, in cooperation with the Ordering Party, b. development surveying document as-built, c. development of documentation for the layout and measurement of the Railway basic geodetic control network and the Railway special control network, development of new diagrams of traffic control stations and expedition points. 1.5.4) Conducting the conformity assessment process of structural subsystems within the scope of the order at each stage and submitting the appropriate EC verification declarations and EC verification certificates for the subsystems. 1.5.5) Conducting the process and obtaining, on behalf of the Ordering Party, permission to operate the Infrastructure, Energy and Control structural subsystems - equipment. trackside 2. Option 1: provision of post-warranty services for the railway traffic control industry and railway telecommunications network equipment after the expiry of the warranty period. Option 2: performance of an additional scope of works consisting in readiness and implementation of cooperation with other contractors performing construction works, deliveries or services for the Ordering Party in the future, which require connection with the facility. buildings under this post. tender. A full description of the subject of the order can be found on the Ordering Partys website: https://platformazakupowa.plk-sa.pl
Related Procurement Opportunities
Similar tenders in Transportation, Railways, Infrastructure and construction