Italy – Road bridge construction work – Joint assignment of the executive design, including safety coordination in the design phase, and the execution of the works, on the basis of the PFTE, to be carried out with information modeling techniques (BIM), relating to the intervention called: O.S. 122/2025_Earthquake 2016_Adaptation of the road system through demolition of the current reinforced concrete bridge and design
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Joint assignment of the executive design, including safety coordination in the design phase, and the execution of the works, on the basis of the PFTE, to be carried out with information modeling techniques (BIM), relating to the intervention called: O.S. 122/2025_Earthquake 2016_Adaptation of the road system through demolition of the current reinforced concrete bridge and design and construction of a new reinforced concrete bridge with double lane for crossing the Tronto river - Lot 2_Construction of new Tronto river crossing and works
Related Procurement Opportunities
Similar tenders in Roads and Highways, Bridges and Tunnels, Infrastructure and construction