Czechia – Groundwater pollution treatment or rehabilitation – "SEZ - Rehabilitation of the saturated zone of the SP8 area, BorsodChem MCHZ, s.r.o."
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The aim of the works is the remediation of the saturated zone of the remediation area SP8 and the reduction of groundwater contamination to the limits specified in the decision of the ČIŽP OI Ostrava, no. 9/OV/8515/05/Cr dated 2 December 2005. The basic remediation method is remedial pumping and cleaning in a decontamination station. Groundwater cleaning will be implemented by two-phase decontamination - the stripping method and the biological remediation method in a flow-through bioreactor. Remedial measures were imposed by the aforementioned Decision of the ČIŽP: Start decontamination of groundwater in area SP8. Deadline within 2 years from the conclusion of the contract with the supplier of remedial works. Complete decontamination