Electricity framework agreement (pool of contractors for minor replacement and adjustment works, and work under management)
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Electricity framework agreement (pool of contractors for minor replacement and adjustment works, and work under management). The Antwerp group's buildings portfolio includes a large number of diverse sites, ranging from administrative buildings and logistics locations to technical installations, cultural infrastructure and public facilities. Regular minor adjustments, urgent interventions and replacement work on electrical installations are necessary to keep these buildings safe, reliable and compliant. These works are often unpredictable, location-related and highly diverse in nature. They range from minor repairs and electrical adjustments to management works that must be carried out immediately, for example in response to defects, inspection deficiencies, infrastructure changes or urgent safety risks. The need for the smooth and flexible deployment of specialized contractors is therefore essential. To guarantee this continuity and at the same time monitor quality, safety and cost-efficiency, a new framework agreement is being launched with a pool of recognized electricity contractors. This framework agreement should make it possible to: • carry out small electrical replacement and adjustment works quickly and in accordance with the applicable standards; • have urgent interventions and management works carried out efficiently without having to initiate a complete procedure each time; • using multiple contractors in parallel, so that availability, lead times and workload can be better managed; • to permanently guarantee the safety and conformity of all electrical installations within our buildings portfolio. The framework agreement offers a standardized, transparent and legally correct way of working for all services involved. The amount of each partial assignment will not exceed 50,000 euros excl. VAT (and without revisions). These assignments relate to secondary education