N01.20 MP-260003 - EP Weyermannshaus - Wankdorf - building surveyor (ID 12220)
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The Bern city tangent is one of the most heavily frequented national road sections. In the years 2008 – 2012, the city tangent was extensively renovated, with the pavements being replaced and numerous inventory objects being renovated and reinforced. In addition, noise protection was expanded in the affected sections and adapted to the requirements at the time. Around 15 years have now passed and the condition of the surface layers has noticeably deteriorated. In recent years, pavement damage has increased, which has led to an increase in short-term maintenance measures (kbU). A UeMa pavement replacement and a maintenance project are therefore being carried out within the project perimeter. The project perimeter includes the following four national road sections: · N01.16 (Bethlehem - Forsthaus junction) · N01.20 (Forsthaus - Wankdorf junction) · N06.32 (Wankdorf junction - Wankdorf junction) · N12.84 (Bümpliz junction - Weyermannshaus junction) This procurement contains the client surveyor mandate for the bridging measure (phases 32-53) and the conservation project (conservation concept (EK) up to phase 53) - The project is created using the BIM planning method. Description of the client surveyor's mandate: · Bridging measure (UeMa) pavement replacement (Phases 32-53) · Maintenance project: Maintenance concept (EK) until commissioning (Phase 53) The planning and implementation of the UeMa pavement replacement runs parallel to the maintenance project (see 06_Framework schedule). In total there are 146 inventory objects (IO) which are divided into the following areas: - Route / environment: 42 - Engineering structures: 52 - Tunnels / geotechnics: 43 - BSA: 3 - External objects: 6