Get Free Access
TZ Ref No.: TZ-26-1428328
Contract Award Awarded Contract National (NCB) Switzerland Infrastructure and construction Water and Sanitation

WV Stettemerstrasse, pipeline construction for district heating, Stettemerstrasse stage 3

Doc ref no. 4430•••
Sector Infrastructure and construction, Water and Sanitation
Contract Date 10 Nov 2026
Contract Value CHF ••••••
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Official Award Result Status: Contract Awarded
Award Date: 10 Nov 2026
Awarded Contract Value: CHF 430,330.00

Contract Description

Civil engineering work is planned at the northern end of Stettemerstrasse in Schaffhausen. SH POWER would also like to further expand the existing district heating network. The existing district heating network should therefore be expanded to the end of Stettemerstrasse. Various buildings are being developed and the exits towards the future Hanfpünt heating center and the development of Krummacker-Strasse are being prepared. The construction of the district heating route is carried out in close cooperation and coordination with the other plants (gas / electricity / Swisscom / Sasag / water and sewerage). The construction process is planned in such a way that all of the works mentioned are renewed or expanded in the same construction phase, so that a long period of use can then take place without any construction work. The civil engineer coordinates the various trades and also forms the interface for coordination with the authorities. The construction of the district heating route is located in the inner-city area with various uses. Residential, commercial and service areas with the corresponding logistical requirements are located along the entire route. The following uses in particular must be taken into account during implementation: · Public transport · Main connecting traffic axis · Pedestrian traffic · Public traffic · Entrances and exits to the area · Ensuring the blue light organization · Ensuring access to residents' properties · Coordination with work from other works management · Limited space SH POWER has created a higher-level communication point that is intended to ensure ongoing information with the public, authorities and residents.

Contract Status
Awarded Contract
Awarded to: Hälg•••
View Contract Award
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 4430•••
Notice Type Contract Award
Contract CPV 45232140
Contract Project Location Switzerland
Contract Value CHF ••••••
Awarded To Hälg•••
Contract Date 10 Nov 2026

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →