Germany – Construction work for tunnels, shafts and subways – Arnstadt new construction PU + new construction lighting + new construction platforms including lighting + preparation of execution
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Passenger underpass including entrances 1) 2 pieces of dismantling shaft scaffolding/mouth house including MTA machine room without elevator technology 2) 30 t dismantling of steel superstructure 3) 160 m³ dismantling of existing buildings (concrete, reinforced concrete, masonry, natural stone) 4) 2350 m³ excavation pit 5) 550 m² shoring of the contractor's choice, partially waterproof design 6) 780 m³ building backfill with lean concrete 7) 925 m³ building backfill and backfilling with earth 8) 300 m³ reinforced concrete work waterproof concrete 9) 115 m² waterproofing work 10) 180 m² seepage walls 11) 128 m wedge steps prefabricated concrete parts 12) 300 m² painting work 13) 2 pieces of new building