D11 1109 Trutnov - state border CZ/PL - Change No. 088.3 D11 1109 Trutnov - state border CZ/PL
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
D11 1109 Trutnov - state border CZ/PL - Change No. 088.3 D11 1109 Trutnov - state border CZ/PL
Construction of D11 1109 Trutnov state border CR/PL follows on from construction D11 1108 Jaroměř Trutnov at km 133,000 and ends at km 154,175. It is a four-lane motorway with a total length of 21,175 metres. The route includes thirteen major bridges over valleys longer than 100 metres, including three large bridge structures: the 715-metre Poříčí Bridge, the 670-metre bridge over the Ličná river valley, and the 330-metre Lampertice Bridge, as well as two tunnels, Poříčí and Opevnění, and three grade-separated junctions: Střítež, Poříčí, Královec. At the border, the Czech motorway connects to the Polish expressway S3, which runs across Poland to the Baltic Sea.
Related Procurement Opportunities
Similar tenders in Infrastructure and construction, Roads and Highways, Transportation