BEAUMONT AR: Project authorship mission for the demolition of RTG and reconstruction of a new building - studies
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
This contract is a public service contract encompassing a complete mission of project author including in particular: The architectural study of the project. The study of special technical equipment (heating – ventilation – electricity – lighting – fire detection, intrusion detection, intercom, elevator, possible Certibeau study / certification, etc.). The study of the 1st equipment included according to the annex to the Order of the Government of the French Community of February 6, 2014 governing physical and financial standards. The EPB study following the new European Directive 2024/1275. The TOTEM study. The reuse audit. The accessibility audit. The stability study. The acoustic study. Interior and exterior signage study. Landscape study. The soil permeability study