Get Free Access
TZ Ref No.: TZ-6340073
Tender Notice Live Notice 🌍 International (ICB) United States Roadways Building Roads and Highways

655-23-101 Site Water Loop Replacement

Doc ref no. 36C2•••
Sector Roadways, Building, Roads and Highways
Publish Date 03 Nov 2026
Estimated Value Refer Document
Tender Intelligence
Qualification analysis + key highlights for this procurement

TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Description & Project Overview

The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed.

Days to Deadline
25 days
Closing: 03 Dec 2026, 18:00
Register to Bid Check Bid Capacity
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Procurement Details

Doc ref no. 36C2•••
Notice Type Tender Notice
Bidding Type ICB
Publish Date 03 Nov 2026
Sector Roadways, Building, Roads and Highways
Bid Security Sign in to view

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →